Overhead Crane Pre-Operation Checklist
A daily pre-operation checklist for overhead (bridge) cranes. Not a substitute for formal OSHA/ASME B30.2 training — pair this with certified instruction and your workplace’s own inspection procedures.
Visual Inspection
- Check hook for cracks, deformation, or a bent/spread throat opening
- Confirm the hook safety latch is present and functioning
- Inspect wire rope or chain for kinks, broken strands, corrosion, or excessive wear
- Check for visible damage to the load block and rigging hardware
- Inspect the bridge and trolley for visible damage or loose hardware
- Confirm warning labels and capacity signage are legible
Operational Check
- Test the upper and lower limit switches before hoisting a load
- Test hoist, bridge, and trolley controls for smooth, responsive operation
- Test the braking system on hoist, bridge, and trolley
- Test the warning horn/signal
- Confirm the emergency stop function works correctly
Before Lifting
- Confirm the load weight is within the crane’s rated capacity
- Confirm rigging is appropriate for the load and properly attached
- Clear the area beneath and around the intended path of travel
- Report any issues found above before operating — do not operate a crane with a known safety defect
Related certification: Overhead Crane Operator Certification
Related guides
- Do You Need Third-Party Certification for an Overhead Crane?
- OSHA Overhead Crane Inspection Requirements: Frequent vs. Periodic
- What Does "Designated Personnel" Actually Mean Under OSHA 1910.179?
- Overhead Crane Hand Signals: The Standard Every Operator Must Know
This checklist is a quick reference and does not replace formal OSHA/ASME B30.2 training or your workplace’s own inspection procedures. © Shield Certificates — shieldcerts.com